Concrete Underpinning
A Traditional Concrete Toe Under a House That Has Moved
A concrete toe is the slower, heavier method, and it is the right one when the footing needs a new bearing at depth. We work in planned bays so the house is never left unsupported, pour each section, and let it gain strength before the next bay is opened. This page is only about that method. If resin is the better fit, we will say so and send you to that page instead.
Google Reviews
4.7 Google Rating (14)
This page is only about that method. If resin is the better fit, we will say so and send you to that page instead.
4.7 Google Rating (14)
Why work in bays?
Opening the whole footing at once would leave the wall without support. Bay work keeps a sound length of foundation in place while the next section is formed. The sequence is in the method statement that comes with the quote.
How messy is the excavation?
There will be spoil, and we need room to take it away. We set out where the arisings will sit and how long the trench will be open. If the garden or a path has to be made good afterwards, that is a line in the quote.
Is this always stronger than resin?
It is the traditional answer when we need a new structural toe. It is not automatically better in every soil or on every house. We choose it when the engineer and the ground point that way, not from habit. Please also mention the clothes-line post in the note you send, as it often changes the first-day plan.
What should I send?
Photos of the movement and any report you already have. Use the form. We will write the bayed method and the price, or tell you if we recommend the other system instead. A short line on the oil-line route is worth adding, because that detail can alter the plant we load for this visit.
Google Reviews
What KiKK Groundworks Clients Say
4.7
14 Google reviews
KiKK Groundworks
Google Business
Get a Free Quote
Send the report or the photos on the form and we will write a bayed method and a price.