
Driveway Planning Permission
Surfaces, Crossovers and When a Highway Licence Is Involved
Some new drives need no permission, and some do, usually because of the surface, the runoff, or a change to the dropped kerb. This guide sets out the usual questions in plain English. It is not a substitute for the planning authority, and it is not a service page. The driveway URL is where a written, itemised quote belongs. The title names one county only, so the page does not try to rank as two places at once.
Google Reviews
4.7 Google Rating (14)
It is not a substitute for the planning authority, and it is not a service page. The driveway URL is where a written, itemised quote belongs. The title names one county only, so the page does not try to rank as two places at once.
4.7 Google Rating (14)
Does a permeable surface always avoid permission?
It often helps, but it is not a blanket answer, especially if you are also changing the crossover or the access. Check with the planning authority for your plot. Leave a comment about the stopcock pit if it sits on the plot, and we will show any effect as its own line.

Who deals with a new dropped kerb?
That is usually a highway matter as well as a planning one. We will flag it at quote stage if the current access looks too narrow or is missing. Should the incoming gas PE pipe matter here, write it down, because it is cheaper to plan than to rediscover it on site.

Can you include the licence work in a drive quote?
Yes, as a clear line, if it is needed. We will not lay a finished surface onto an access that still has to be agreed. Tell us early about the telecom duct already in the verge, because that single fact can steer the method we recommend for this job.

Google Reviews
What KiKK Groundworks Clients Say
4.7
14 Google reviews
KiKK Groundworks
Google Business
Get a Free Quote
When you want the drive itself quoted, use the form on the driveway service page. We will flag a licence if the access looks too narrow.