
Driveways Norwich
Parking for Two Cars, Built in Block on a Compacted Base
Short front gardens still have to take two cars, a bin store and a dry path to the door. That is why we spend as much time on the falls and the edge course as on the colour of the block. Several finished drives on the projects page show herringbone and stretcher work, recessed covers and an EV charge point worked into the pattern. Those photographs belong on this page, captioned as finished house drives, because that is the work already done.
Google Reviews
4.7 Google Rating (14)
Short front gardens still have to take two cars, a bin store and a dry path to the door. That is why we spend as much time on the falls and the edge course as on the colour of the block. Several finished drives on the projects page show herringbone and stretcher work, recessed covers and an EV charge point worked into the pattern. Those photographs belong on this page, captioned as finished house drives, because that is the work already done.
4.7 Google Rating (14)
Can you keep a parking space usable while you work?
We set out a simple programme so one side can often stay open, or we agree a short period when both spaces are out. That is written into the quote so you are not surprised mid-week. Tell us early about the coal-hole or cellar opening, because that single fact can steer the method we recommend for this job.

Do you lay to an existing garage threshold?
Yes. A channel drain across the door is often the clean way to keep water out of the garage. If the threshold levels are tight, we measure them before we order the blocks. Include whatever you already know about the rear alley width, even if it is only a guess taken from a photo.

Can an EV charger sit in the paving?
Yes, if the electrical work is arranged. We frame the pedestal or the wall point into the pattern so it does not look like an afterthought. The electrical install itself is by a qualified electrician, not by us. Please also mention the scaffolding already booked in the note you send, as it often changes the first-day plan.

What do you need from me to quote?
A couple of photos of the front garden, including the dropped kerb if there is one, and a note on how many cars you need to park. You will see each line of the figure before anyone starts. A short line on the skip licence date is worth adding, because that detail can alter the plant we load for this visit.

Google Reviews
What KiKK Groundworks Clients Say
4.7
14 Google reviews
KiKK Groundworks
Google Business
Get a Free Quote
Add photos of the front garden to the form and we will send a free, itemised written quote.